Polypipe Warehouse 2 & Transport Office – Washroom Refurbishment

Polypipe, based in Aylesford, Kent had 3 washroom areas that were all very old and out of date. Not only that, one of the areas needed reconfiguring to achieve better use of space. As a long-standing client of Interfix, they called on us again to help them with their project.

As with previous projects completed at the site, the general spec throughout consisted of vinyl flooring, Hygienic wall cladding, suspended ceiling and lighting, vanity units, Velocity solid grade laminate cubicles, WC and Urinal duct panels.

Due to very old existing pipework, we discovered that a section of pipework was damaged and had to be replaced in the ceiling void below. Not only this, but a lot of the existing pipework was blocked so we had to get this jetted out to solve the issue.

Despite this challenge the project was successfully completed, and the client satisfied with their new washrooms. We look forward to working with them again in the future!

PROJECT DETAILS

Aspects Covered:

WC Duct Panels, Urinal Duct Panels, Vinyl Safety Flooring, Velocity Cubicles, Sanitaryware, Vanity Units with Recessed Basins.